Carbon Steel Jic Ferrule Male Cone Tee Flared Tube Fittings
1.Product Name: Carbon steel JIC ferrule male cone tee flared tube fittings 2.Description: Material: Carbon steel Techni
Description
Basic Info.
Model NO. | AJ |
Structure | Tee |
Working Temperature | -20 to 200 Celsius Degree |
Power | Hydraulic |
Medium | Water, Oil, Gas |
Type | Tube Adapter |
Od Size | 1/16′′-1′′ |
Head Code | Hexagon |
Technique | Forged |
Shape | Equal |
Transport Package | Wooden Box |
Specification | 38*27*17cm |
Trademark | YC-LOK |
Origin | Jiangsu, China (Mainland) |
HS Code | 7307290000 |
Production Capacity | 10000PCS/Week |
Product Description
1.Product Name:
Carbon steel JIC ferrule male cone tee flared tube fittings
2.Description:
Material: Carbon steelTechnique: Forged
Type: Tube adapter
Place of Origin: Jiangsu, China (Mainland)
Brand Name: YC-LOK
Connection: Thread
Shape: Equal
Head Code: Hexagon
OD Size: 1/16''-1'' ,3mm-25mm
Structure: union,elbow,tee,cross,bulkhead,male or female connector
Working Pressure: up to 6000psi
Medium: water, oil, gas, acid ,base and so on
Special Treatment: ferrule hardness treatment
Nut Treatment: silver planted
Tube Treatment: fully annealed
Inner Cone: mirror polishing processing
Working Temperature: -20 to 200 Celsius degree
Power: hydraulic
3. Packaging & Delivery
1.Packaging Details: | 1. Wooden box2. Carton3. As your request. |
2.Delivery Detail: | Shipped in 30 days after payment |
3.Logo: | Any logo is available |
4.MOQ: | 100 pcs |
5.Samples: | Free |
6.OEM Accepted | Yes |
7.Production Capacity: | 10,000pcs Per week |
8.Payment Term: | (1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM |
FAQ:Q1.Can I get free samples?
A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q3. Are you a trading company or a manufacturer?
A: We are a manufacturer.
Q4. What is your payment term?
A:Normally T/T 50% in advance, balance to be paid before delivery.
Q5: What is your main market?
A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.
Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.
Q7. What about the lead time?
A:Sample needs 15 days, mass production time needs 35 days.
Prev: PU Black Plastic Pneumatic One Touch Tube Fitting
Next: Taizhou China Pipe Fittings PVC Elbow Connection Integral Socket Supplier Substantial Discount
Our Contact
Send now